|
Odds and Ends
- Corporate Report Template
- Designed, installed, and provided training in the use of a Microsoft
Word template to be used for reports prepared by a not-for-profit
consulting firm. Defined styles for all document elements and created
a custom menu and toolbar for applying those styles.
Client: Portland Energy Conservation, Inc.
- WVC STC 2001-2002 Membership Directory
- Designed the annual membership directory of the Willamette Valley
Chapter (Portland, OR) of the Society for Technical Communication.
Volunteer work for WVC STC.
- Proposal to Northwest Energy Efficiency Alliance
- Designed, edited, assembled the text for, and created diagrams and
charts for a contract-winning proposal to the Northwest Energy
Efficiency Alliance to manage a program for electric utilities that
promotes energy-efficient residential lighting.
Client: Ecos Consulting, Inc.
- Proposal to the Port of Portland
- Designed, cowrote, edited, and produced a proposal to the Port of
Portland, in response to an RFP, to dismantle and recycle the
materials from a pier on the Willamette River.
Client: Storie Steel and Wood Products Company,
Inc.
- WVC STC 1995-1996 Membership Directory
- Designed and produced the annual membership directory of the
Willamette Valley Chapter (Portland, OR) of the Society for Technical
Communication. Wrote Excel Visual Basic macros to generate both
alphabetical and randomly sorted listings for separate sections of the
directory--Contact Information, Capabilities, Job Categories, Skill
Areas, and Knowledge Areas.
Volunteer work for WVC STC.
- Strategic Issue Papers
- Edited and cowrote issue papers on addressing, in the 1996 Power
Plan, the reliability and persistence of energy savings through
Building Commissioning and Operation and Maintenance.
Client: Northwest Power Planning Council,
Portland, OR (while employed at PECI)
- A Conceptual Design for a Demand-Side-Management
Program for Commercial New Construction, Renovations, and Remodels
- Designed a conceptual demand-side-management program aimed at new
commercial construction. Designed and wrote the 26-page program
description. Designed a set of program-screening spreadsheets and
evaluated the cost-effectiveness of the program. Documented the
analysis in a 38-page appendix.
Client: Consolidated Edison of New York (while
employed at PECI who was under contract to the Natural Resources
Defense Council)
|